  "country": "GB",
  "queue_gw": 381.4,
  "queue_breakdown": {
   "battery": 83.2,
   "transmission_connected_demand": 98.5,
   "offshore_wind": 69.9,
   "solar": 59,
   "onshore_wind": 17.9,
   "interconnector": 13.2,
   "low_carbon_dispatchable": 13,
   "ldes": 9.1,
   "nuclear": 6.7,
   "unabated_gas": 6,
   "other_incl_non_gb_tidal_hydro": 4.9
  },
  "as_of": "2026-01",
  "source_url": "https://www.neso.energy/document/374936/download",
  "peak_demand_gw": 45.9,
  "peak_source_url": "https://www.neso.energy/data-portal/historic-demand-data",
  "notes": "Reformed queue after NESO Gate 2 to Whole Queue (pipeline announced 8 Dec 2025; 'Connections Reform Detailed Results Data', Jan 2026). Projects expected to receive Gate 2 offers: Phase 1 (needed by 2030) 143.4 GW + Phase 2 (by 2035) 238.0 GW. Covers transmission plus distribution projects in scope of CMP435. Demand uses Demand Capability; storage counted once. Not included: 554.8 GW pushed to Gate 1 (205.7 self-elected, 217.3 failed strategic alignment, 127.3 did not apply, 4.5 failed readiness). The old queue was 'over 700 GW' (NESO results page). The live TEC register (13 Oct 2026) still lists 608.2 GW of not-yet-connected TEC increases (gate 2: 16.0, gate 1: 293.4, ungated: 298.8), plus 32.5 GW interconnectors and 10.2 GW in the embedded register, because contracts are re-issued gradually; do not add these to the Gate 2 figure. Peak: GB National Demand (ND, transmission, excludes embedded generation offset, pumping, exports) 45,924 MW on 2025-01-09 settlement period 35, computed from NESO demanddata_2025.csv; ND plus embedded wind and solar at that half-hour was 48.1 GW. ENTSO-E's 'UK' figure (1.48 GW) covers Northern Ireland only, so it is not used."
 },
 {
  "country": "ES",
  "queue_gw": 168.2,
  "queue_breakdown": {
   "generation_storage_with_permits_not_in_service": 87.09,
   "generation_storage_requests_in_process": 47.07,
   "demand_with_permits_not_in_service": 11.05,
   "demand_requests_in_process": 22.97
  },
  "as_of": "2026-09-30",
  "source_url": "https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes",
  "peak_demand_gw": 39.7,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "REE access-and-connection status widget, national scope, MW of access capacity, data at end of month (monthly update in the first working days). Scope: installations that processed access through REE, i.e. transmission-connected plus distribution-connected projects with REE 'aceptabilidad' (>1 MW peninsular, >0.5 MW islands); smaller DSO-only projects are not included. Generation+storage: 'con permisos' (permits granted, not yet in service) 87.09 GW (PV 42.2, wind 15.6, hybrid 14.0, batteries 10.9, pumped hydro 3.4) + 'en curso' (requests in process) 47.07 GW (PV 13.1, batteries 12.9, wind 12.1); 136.8 GW is 'puesta en servicio' (connected). Demand: con permisos 11.05 GW + en curso 22.97 GW; data centres 22.1 GW of the 34.0 GW, hydrogen 6.7 GW. Demand categories exclude storage, so storage is counted once. Extracted from the REE widget by the ES importer: data/es/ree/status_map/status_aggregates_2026-09-30.csv. Cross-check: REE nodal file 2026_10_01_GRT_generacion.csv sums to 47.08 GW 'en curso' generation+storage, matching. Peak: ENTSO-E 2025 hourly peak, 15 Jan 2025 (flagged incomplete publication)."
 },
 {
  "country": "NL",
  "queue_gw": 76,
  "queue_breakdown": {
   "tennet_offtake": 34.2,
   "tennet_infeed": 26.1,
   "regional_dso_offtake": 10,
   "regional_dso_infeed": 5.7
  },
  "as_of": "2026-06-30",
  "source_url": "https://www.netbeheernederland.nl/sites/default/files/2026-10/stand_van_de_uitvoering_halfjaar_2026.pdf",
  "peak_demand_gw": 19.6,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "Netbeheer Nederland 'Stand van de Uitvoering halfjaar 2026' (published 5 Oct 2026). Waiting lists for transport capacity (requests that could not be granted because of congestion), not all requests in process. TenneT: 205 offtake requests (34.2 GW) and 156 infeed requests (26.1 GW), mainly industry, battery projects and data centres. Regional DSOs: 15,498 offtake requests (9,986 MW) and 8,558 infeed requests (5,693 MW), large consumers only (small consumers joined the list from 1 Jul 2026 and are not in these figures). A battery can appear on both the offtake and infeed lists, and some applicants file at several sites/operators, so the total overstates unique capacity. TenneT offtake list peaked at 65.8 GW (2024) before clean-up. Peak: ENTSO-E 2025. Cross-check: the capaciteitskaart CSV exports (https://capaciteitskaart.netbeheernederland.nl/api/download/voedingsgebieden.csv and tennetgebieden.csv, fetched 2026-10-16, current-year rows) sum to only about 39.5 GW (RNB 6.1 infeed + 8.2 offtake; TenneT 9.8 infeed + 15.4 offtake). The regional figures roughly match the report; the TenneT area figures are far lower than the report's 60.3 GW, probably because the map assigns only part of TenneT's list to congestion areas. Use the report for the headline and the CSVs for the map, and do not expect them to reconcile."
 },
 {
  "country": "DK",
  "queue_gw": 60,
  "queue_breakdown": null,
  "as_of": "2026-06",
  "source_url": "https://www.energinet.dk/om-nyheder/nyheder/2026/07/03/nyt-kort-viser-fremtidens-pres-pa-eltransmissionsnettet/",
  "peak_demand_gw": 6.3,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "Energinet: applications and inquiries for new consumption received by Energinet and the DSOs over the last two years total 'knap 60 GW' (just under 60 GW), mostly data centres, battery parks and Power-to-X; data centres plus batteries were about 2/3 of 2024-2025 applications. Inquiries are included, so this is a soft number. Separately, capacity is reserved for 11 GW of new consumption with signed connection agreements but not yet connected (same article); that is the firmer figure. Generation (solar/wind) connection requests are not included. Energinet compares it with a max demand of 'godt 7 GW'; ENTSO-E 2025 hourly peak is 6.25 GW (13 Jan 2025)."
 },
 {
  "country": "IT",
  "queue_gw": 595.2,
  "queue_breakdown": {
   "solar": 139.7,
   "onshore_wind": 104,
   "offshore_wind": 63.6,
   "other_renewables": 2.3,
   "storage_standalone": 253.6,
   "storage_colocated_with_renewables": 24.8,
   "pumped_hydro": 7.2
  },
  "as_of": "2026-09-30",
  "source_url": "https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion",
  "peak_demand_gw": 49.6,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "Terna Econnextion, active connection requests to the Terna (HV/EHV) grid, renewables (FER) 309.6 GW in 5,637 files + storage (Accumuli) 285.6 GW in 3,461 files, data reference date 30 Sep 2026 (from data/it/terna_econnextion_*_Region exports). By status: STMG offer to be accepted 74.9 GW, STMG accepted 198.0 GW, projects in authorisation 105.6 GW, projects authorised ('nulla osta') 191.7 GW, detailed solution/contracts 25.0 GW. Generation and storage only; no demand (data centre) requests are included. Many requests are speculative and site-duplicated; Italy's whole fleet is about 101 GW (ENTSO-E NGC 2025). Peak: ENTSO-E 2025, 3 Jul 2025."
 },
 {
  "country": "PL",
  "queue_gw": 261.8,
  "queue_breakdown": {
   "solar": 35,
   "wind": 8.9,
   "storage_discharge": 63.7,
   "hybrid_mix_injection": 83.4,
   "other_generation": 30.7,
   "consumers": 40.1
  },
  "as_of": "2026-08-31",
  "source_url": "https://www.pse.pl/documents/20182/51490/WZIP_OSD_2026_06_30_OSP_2026_08_31.pdf",
  "peak_demand_gw": 26,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "PSE 'Wykaz Zagregowanych Informacji o Przyłączeniach' (art. 7 ust. 8n Prawo energetyczne), Table 1, connection capacity (moc przyłączeniowa) for networks >1 kV: transmission as of 2026-08-31, the five large DSOs as of 2026-06-30. Counted stages: applications under verification or complete (28.8 GW injection), connection conditions issued (125.5 GW), connection agreements in force (67.4 GW); excluded: incomplete, withdrawn, refused, expired, terminated, connected. Injection total 221.7 GW + consumers (ODB) 40.1 GW. Storage charging (65.2 GW) and hybrid offtake (53.1 GW) are left out to count storage/hybrids once. PSE also publishes a separate list of preliminary connection conditions for offshore wind; whether those MW sit inside 'other generation' here was not checked. Peak: ENTSO-E 2025, 24 Nov 2025."
 },
 {
  "country": "FR",
  "queue_gw": 53.6,
  "queue_breakdown": {
   "solar": 30.9,
   "onshore_wind": 13.2,
   "offshore_wind": 9.3,
   "other_renewables": 0.2
  },
  "as_of": "2024-12-31",
  "source_url": "https://odre.opendatasoft.com/explore/dataset/suivi-projet-raccordement-enr/",
  "peak_demand_gw": 86.6,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "ODRE 'projets en développement' (renewable projects in the connection queue, file d'attente) at 31 Dec 2024, the latest version of this annual dataset: RTE grid 28.7 GW + distribution grids 24.9 GW. Renewables only; no storage or consumption requests. Fresher partial figures: capareseau S3REnR file d'attente 37.9 GW on 12 Oct 2026 (RTE 14.6 + DSOs 23.3, onshore renewables within the regional S3REnR schemes only; data/fr/capareseau/capareseau_france_backup_20261012_132808.csv, column INFO_FAS3R), and Enedis alone 32.6 GW in queue at 30 Jun 2026 including 3.5 GW storage (data/fr/enedis/enedis_projets_dev_tranches_repartition.csv). Peak: ENTSO-E 2025, 14 Jan 2025 (flagged incomplete)."
 },
 {
  "country": "PT",
  "queue_gw": 18.1,
  "queue_breakdown": {
   "rnt_assigned_not_connected_operator_agreement": 11.7,
   "rnt_assigned_not_connected_other": 2.4,
   "rnd_committed": 2.8,
   "rnd_in_confirmation": 1,
   "rnd_operator_agreement": 0.3
  },
  "as_of": "2026-06-30",
  "source_url": "https://www.dgeg.gov.pt/media/fc4ajwn2/_tabela-de-capacidade_rnt.xlsx",
  "peak_demand_gw": 9.4,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "DGEG injection capacity tables under Portaria 433-A/2026/1 (sheet 'CapacidadeRNT-20260630-VSRefAd'; RNT data from REN, RND data from E-REDES, file https://www.dgeg.gov.pt/media/1xwgku2c/_tabela-de-capacidade_rnd.xlsx). Units are MVA, not MW. Injection (generation/storage export) capacity assigned but not yet connected: RNT 14.06 GVA (agreement modality 60 AT + 11,642 MAT; other modalities 51 AT + 2,307 MAT), RND 4.08 GVA (committed 2,817 + in confirmation 990 + operator agreement 271 MVA, summed over all rows; codes that repeat are substations split across two RNT groups with different values, not duplicates). The Santo Andre/Sines/Sines Sul values (350 and 274 MVA) are merged cells over three rows in the xlsx and are counted once. Not included: 1.05 GVA reserved for competitive storage procedures (300 MVA co-located, 750 MVA standalone; the per-substation reservation cells sum higher but are capped by the zone value, note 1 of the table). New merchant-generation requests have been suspended since Despacho 27/2020, so this understates interest. No demand-side figure published. Connected for comparison: RNT 15.9 GVA, RND 7.9 GVA. Peak: ENTSO-E 2025, 3 Dec 2025 (REN Dados Tecnicos 2025 gives 9,395 MW on 3 Dec 2025 19:45)."
 },
 {
  "country": "IE",
  "queue_gw": 14.7,
  "queue_breakdown": {
   "tso_contracted_non_wind": 12.6,
   "tso_contracted_wind": 2.1
  },
  "as_of": "2026-08-05",
  "source_url": "https://www.eirgrid.ie/industry/customer-information/connected-and-contracted-generators",
  "peak_demand_gw": 5.9,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "EirGrid 'Contracted TSO Generators' reports correct as of 05/08/2026 (TSO-Contracted-Non-Wind-Report-05-08-2026.pdf: 12,640.9 MW; TSO-Contracted-Wind-Report-05-08-2026.pdf: 2,053.45 MW). Signed connection agreements, not yet connected, by MEC. Non-wind is mostly solar, batteries and hybrids from ECP-2.x batches, plus gas/OCGT and the Celtic (700 MW) and Greenlink (504 MW) interconnector lines. Excludes DSO-contracted generation (ESB Networks), applications not yet offered, and demand (data centres). Ireland only, not Northern Ireland. Peak: ENTSO-E 2025, 8 Jan 2025 (flagged incomplete)."
 },
 {
  "country": "NO",
  "queue_gw": 26,
  "queue_breakdown": null,
  "as_of": "2026-10-15",
  "source_url": "https://www.statnett.no/for-aktorer-i-kraftbransjen/nyhetsarkiv/rekordinteresse-for-tilknytning-med-vilkar.-nye-kriterier-innfores/",
  "peak_demand_gw": 23.4,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "Weak. Statnett (15 Oct 2026): 'so far in 2026' requests to connect 26,000 MW of new consumption; this is the inflow during 2026, not the total queue. Statnett's full queue and reservations are only published in Power BI embeds (statnett.no/nettkapasitet-til-produksjon-og-forbruk/foresporsler-og-reservasjon-i-nettet/), which were not scraped. Consumption only. Peak: ENTSO-E 2025, 6 Jan 2025 (flagged incomplete); Statnett gives the all-time hourly record as 25,309 MWh/h."
 },
 {
  "country": "DE",
  "queue_gw": null,
  "queue_breakdown": null,
  "as_of": "2026-03",
  "source_url": "https://www.netzentwicklungsplan.de/sites/default/files/2026-07/Szenariorahmen_zum_NEP_2040_2045_Version_2027_.pdf",
  "peak_demand_gw": 75.6,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "No verified national figure. The four TSOs' draft scenario framework NEP 2040/2045 (2027), published Jul 2026, used a consolidated list of connection requests and commitments for large consumers and big batteries at TSO and DSO level as of March 2026, but shows it only as charts by project status. The text says 'Planung'-status batteries weighted at 15% add almost 20 GW, which implies about 130 GW of battery projects in that one status alone; the total is not stated. Since 1 Apr 2026 TSO connections for storage and large loads go through the 'Reifegradverfahren' (first cycle deadline 30 Jun 2026); no results were found published. Generation (EEG/onshore) queues are not published nationally either. Peak: ENTSO-E 2025, 27 Nov 2025."
 },
 {
  "country": "BE",
  "queue_gw": null,
  "queue_breakdown": null,
  "as_of": null,
  "source_url": null,
  "peak_demand_gw": 13,
  "peak_source_url": "https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/Publications/Statistics/Factsheet/entsoe_sfs2025_web.pdf",
  "notes": "No live figure. elia.be returns a Cloudflare 'Just a moment' challenge to scripted requests (not bypassed), and Elia's Opendatasoft portal has no connection-queue dataset. An Internet Archive capture of the Elia grid-hosting-capacity page (https://web.archive.org/web/20251209042230/https://www.elia.be/en/customers/connection/grid-hosting-capacity, 'Situation end September 2025') lists capacity reserved or allocated on top of the existing system up to 2034: batteries 10.6 GW (incl. pending reservations), offshore wind 3.5 GW, onshore wind 2.5 GW (+0.8 pre-reserved), solar 0.9 GW (+5.6 pre-reserved), i.e. about 17.5 GW, or 23.9 GW with pre-reserved margins; demand is given only in energy (data centres +14.9 TWh). Left as null because it comes from an archive copy of a bot-protected page and is a year old; fill in if you are content with that source or once Elia confirms a current figure. The hosting-capacity export in data/be/ gives available MW per substation, not a queue. Peak: ENTSO-E 2025, 17 Feb 2025."
 }
]